Skip to content
D

Master Plan 2019 SDCP Park Connector Line layer

URA Master Plan 2019 Parks and Waterbodies Plan spatial data includes indicative park connector alignments under the SDCP in this collection. GEOJSON and KML datasets Master Plan 2019 SDCP Park Connector Line layer support green network and active mobility mapping across Singapore. Planners integrating connectors with NParks programmes can overlay line geometry with related waterbody plans. Alignments are indicative SDCP graphics rather than construction-ready engineering drawings.

Official description

Indicative alignment Park Connector in the Parks and Waterbodies Plan. The Parks and Waterbodies Plan is a Special and Detailed Control Plan (SDCP) which provides guidelines and controls for specific area of development.

Published by
Urban Redevelopment Authority
Update frequency
ad-hoc
Datasets
1

Datasets in this collection

GEOJSON

Master Plan 2019 SDCP Park Connector Line layer (GEOJSON)

Urban Redevelopment Authority GeoJSON of indicative Park Connector alignments from the Master Plan 2019 Parks and Waterbodies Special and Detailed Control Plan. Active-mobility and planning users map connector corridors; note content superseded by DMP25 in June 2025.

Urban Redevelopment Authority